Floors, Hidden Vanities, Studio, Office, Wrist & Finger

Okay, the shower is tiled, but now is covered in plastic sheeting, protected by the painter from the paint. Hidden but not forgotten as its door arrives Friday!

But what else has been happening? We now have floors. Not rugs. Not hardwood. Vinyl, 20mm thick, looks like wood and designed for dogs. You read that right: dogs. The flooring has textures so that dogs have traction and don’t go flying down the hallway. It’s actually quite nice. It feels good underfoot.

And, the vanities have arrived, but until the painter is done, they remain covered and mysterious. They need to be installed before the template for the countertops can be made, and then installed.

My studio and J’s office are beginning to become usable again. Funny how daily habits, when upset, are so nice to take up again. I like reading the news and drinking my coffee in the morning, and perusing other blogs. My cameras are back on the shelves – not all of them, but a lot of them – and I used my Nikon Df here, with the 85mm f1.8, to take some photos. I also used some film cameras outdoors … the drafting table is in place, and paints and paper and brushes are reappearing.

And, my wrist and finger are mending very well, and I am out of the finger splint altogether, but wear the wrist splint at night or when my wrist feels tires or sore. Hard to believe I went flying over Smudge (dog) 4 weeks ago.

Home, Sweet Home!

Thursday Morning

This has been quite a week or so.  I am so glad I get the next ten days off from work, starting at 5 p.m. tonight.  I am just about done in!

You could say it began two weeks ago.  A pipe broke under the shower pan in the master bathroom.  Three days later, half the carpet in the bedroom is gone, the shower stall is destroyed, and the leak is fixed.  Now all that remains is arguing with the insurance company, choosing tile for the bathroom, ordering tile for the bathroom, ordering flooring for bathroom and back third of the house, painting the bathrooms and bedroom, and installing new vanities, possibly one or two new toilets, new mirrors, and new lighting in the bathrooms.  Maybe it will be done by the end of April.  The other half is going bonkers with all the estimates and people coming and going.  Besides that, I had a 3-day painting workshop (yay!), a nasty cold and flu, and now Josh has the cold.

So, what is going to happen during the break?  A few appointments.  Lots of art if I am lucky.  Lots of photography, too.  Choices being made for tile and paint – the flooring is already chosen – and writing big checks for all this stuff.  And researching what “contiguous” means in context of California insurance law – but that is another story!

And, of course, organizing all the bits and pieces of my life that have fallen apart over the last few weeks.  I never realized how disorganization is like a perpetual motion machine – it is entropy at its worst!

Cactus, Shadows

It’s been awhile since my last post – just over a month.  Part of that has been limited time because of a bunch of things going on in our lives, as well as a shift into focusing – and refocusing – on painting.  There is not enough time in the day!  But, a lot of times painting is an indoor activity, and I miss the outdoors.  Cabin fever sets in.

Yesterday was finally a relatively taskless day (compared to every other day!), so I went to the bank, went to have a camera repaired, only to have it fixed right then and there by the store owner, and thence, on to the local botanical garden.  With rain coming up today, I knew the garden would be closed to the public, and with rain forecast for the next few weeks, it will be closed for some time.

It was an absolutely lovely day, and I got a few good pictures of old friends, like ancient oaks and spring bulbs, and the cactus on the top of the hill.